Our newbuild Commissioning Service Operation Vessels are designed with unparalleled flexibility and operability, for operations in wind farms anywhere in the world. Prepared for emission-free operations with a hydrogen-based propulsion system, in just a few years they’ll enable the construction and commissioning of wind farms without generating carbon emissions.
TBA
2025
Astilleros Gondán
Norway (NIS)
88.30 m
19.70 m
5.30 m
TBC
2024
Astilleros Gondán
Salt 0217
Edda Wind Management AS
C504
TBA
Norway (NIS)
Haugeund
TBA
✠1A BIS Battery(Power) BWM(T) Clean(Design) COMF(C-2, V-2) DK(+) DYNPOS(AUTR) E0 HELDK NAUT(OSV) Recyclable SF SPS Walk2work
500 m2
5 t/m2
120
52
34
4
2
Yes
Gym, day room and game room
88.30 m
77.10 m
19.70 m
6.60 m
5.30 m
36.35 m
400 m2
2.75 m
2.5 t/m2
MacGregor Horizon V4 3D comp.
MacGregor 5T 3D Crane
3D Lift: 5.0 t 1-Fall: 10.0 t 2-Fall: 20.0 t
Optional
Marine Aluminium 18.1m
Aft
2 x Voith Schneider eVSP
3 x Brunvoll tunnel thrusters
MGO/LOHC