Our newbuild Service Operation Vessels are designed to set a new standard in the offshore wind market. Every effort has been made in the design to maximize the efficiency of operations in the wind farm. In addition, these vessels will be ready for running emission-free on a hydrogen-based propulsion system. Within just a few years they will be the first SOVs operating without carbon emissions, truly enabling a green future.
LALH8
2024
Astilleros Balenciaga
Norway (NIS)
82.85 m
18.60 m
5.30 m
TBC
2022
Astilleros Balenciaga
Salt 0358
Edda Wind Management AS
C416
LALH8
Norway (NIS)
Haugeund
9914137
✠1A BIS Battery(Power) BWM(T) Clean(Design) COMF(C-3, V-3) DK(+) DYNPOS(AUTR) E0 NAUT(OSV) Recyclable SF SPS Walk2work
340 m2 external, 120 m2 sheltered
5 t/m2 external, 2.5 t/m2 sheltered
60
60
0
3
2
Yes
Gym, day room and game room
82.85 m
71.65 m
18.60 m
7.20 m
5.30 m
28.00 m
470 m2
2.55 m
2.5 t/m2
MacGregor Horizon V5 3D comp.
MacGregor 3T 3D Crane
3D Lift: 3.0 t 1-Fall: 10.0 t 2-Fall: 20.0 t
Alusafe 1150WF 12 PAX
Optional
Aft
2 x Voith Schneider eVSP
3 x Brunvoll tunnel thrusters
MGO/LOHC