Our purpose-built service operation vessels (SOV) are designed to provide safe access for personnel to Wind Turbine Generators (WTG) combined with a high standard of accommodation at sea.
LALY8
2018
Astilleros Gondán
Norway (NIS)
81.00 m
17.00 m
5.40 m
TBC
2018
Astilleros Gondán
Rolls Royce UT540WP
Edda Wind Management AS
C471
LALY8
Norway (NIS)
Haugeund
9808778
✠1A1 BIS BWM(T) Clean(Design) COMF(C-2, V-2) DK(+) DYNPOS(AUTR) E0 HELDK NAUT(AW) Recyclable SPS Walk2work
360 m2
5 t/m2
60
58
2
3
1
Yes
Gym, day room and game room
81.00 m
74.17 m
17.00 m
7.30 m
5.40 m
38.00 m
350 m2
2.5 m
5 t/m2
Uptime 23.4 m 3D comp.
SMST 1T 3D crane
3D Lift: 1.0 t 1-Fall: 2.0 t
Alusafe 1150WF 8 PAX
Marine Aluminium 17.0 m
Aft and SB
2 x Rolls Royce Azimuth thrusters
3 x Rolls Royce Tunnel thrusters
MGO/MDO